Carnival Liberty

Date: November 2016

Place: Freeport, Bahamas

Scope of work: Main, Aft and Forward pools refurbishment including: 

  • Demolition 

  • Steel works and resin refurbishment where needed 

  • New stainless steel overflow installation in main pool

  • New mosaic and tiles installation in pool tanks, beach area and pool walls

  • Statue removal on Aft and main pool 

  • New steel panel installation adjacent to the main pool bars, replacement of profiles and mosaic tiles 

Click image to enlarge

TUTTOTONDO GROUP,  LLC       4451 NW 74TH AVE.  MIAMI, FL 33166 U.S.A.       T: +1 305 787 3773  F: +1 305 735 8971