top of page
Date: November 2016
Place: Freeport, Bahamas
Scope of work: Main, Aft and Forward pools refurbishment including:
-
Demolition
-
Steel works and resin refurbishment where needed
-
New stainless steel overflow installation in main pool
-
New mosaic and tiles installation in pool tanks, beach area and pool walls
-
Statue removal on Aft and main pool
-
New steel panel installation adjacent to the main pool bars, replacement of profiles and mosaic tiles
Waterpark Pool
AFTER Click to see the Before Pictures
Waterpark Pool
IN PROGRESS
Lido AFT Pool
BEFORE
Waterpark Pool
AFTER Click to see the Before Pictures
1/8
Click image to enlarge
bottom of page