Date: February 2017
Place: Freeport, Bahamas
Scope of work: removal of fiber optic light trees at the Promenade mid-ship bar and installation of new RGBW dimmable LED lights tubes per CCL specification in addition to the replacement of 98 ceiling panels.
AFTER Click to see the Before Pictures
BEFORE
AFTER Click to see the Before Pictures
Click image to enlarge
Scope of work: removal of qty 19 palms, stage teak repair and sanding/caulking.
AFTER Click to see the Before Pictures
BEFORE
BEFORE
AFTER Click to see the Before Pictures
Click image to enlarge
Scope of work: replacement of panels and laminates close to male and female steam rooms, Film replacement in the male and female corridors and Sauna refurbishment.
AFTER Click to see the Before Pictures and Spa Corridors
BEFORE
BEFORE
AFTER Click to see the Before Pictures and Spa Corridors
Click image to enlarge
Scope of work: teak removal on Deck 14 to allow installation of an auxiliary diesel generator.
AFTER Click to see the Before Pictures
BEFORE
AFTER Click to see the Before Pictures