Date: April 2017
Place: Hamburg, Germany
Scope of work: Extensive marble, fiberglass and door frame repairs in staterooms:
-
Marble bathroom floor repair, re-grouting and polishing including marble countertops in 27 suite cabins
-
Cabin shower basement fiberglass repair and recoating in 73 cabins
-
Cabin bathroom door frame repair
AFTER Click to see the Before Pictures
BEFORE
BEFORE
AFTER Click to see the Before Pictures
Click image to enlarge
Scope of work: Tile re-grouting in Horizon Court with a tile replacement at the Horizon Port Side Aft
coffee station.
AFTER Click to see the Before Pictures
DURING
AFTER
AFTER Click to see the Before Pictures
Click image to enlarge
Scope of work: Deck 7 Mid-ship and Deck 15 Mid-ship:
-
Crooner’s Bar marble restoration and polishing
-
Mermaid Pizzeria and Trident Restaurant retiling
-
Meridian entrance marble restoration
AFTER Click to see the Before Pictures
BEFORE
BEFORE
AFTER Click to see the Before Pictures